Go top
Project information

Assessment of PO13.1

E. Lobato

January 2026 - February 2026

Funding entity Alfanar Energía España S. L. U


Assessment of the reduction of the connection rights of renewable generation to the transmission grid at the Cerrato 400 kV node.


Layman's summary: Assessment of the reduction of the connection rights of renewable generation to the transmission grid at the Cerrato 400 kV node.



Alfanar_Cerrato400